Commit Graph

3 Commits (05c37af4c9dc9724b31ffdc28fe7374923b6cd03)

Author SHA1 Message Date
Petr Mrázek 9db20bd84d Header changes/cleanup. 2011-12-31 12:48:42 +01:00
zilpin 4eb13800cd -WriteVein(), and some convenience functions for the vein bitmaps. 2011-07-18 15:55:41 -04:00
zilpin de24b01a69 -fix pillar tile types to be TILE_SMOOTH instead of TILE_NORMAL.
-Added working (though clumsy) draw tile tool.
-Began lumberjack and veinswap tools.
2011-07-13 23:44:37 -04:00